In June 2019, Cobra Montajes Servicios y Aguas Ltda, on behalf of the project owner, Minera Spence, a subsidiary of BHP Billiton, awarded LEPSA CHILE SpA with the erection, assembly, and site joining of FRP pipes and fittings, as part of the works for the 86,400 m3 per day desalination plant, located in Mejillones, Antofagasta, Chile.
The project consist on the erection, pre-assembly, and joining of FRP aboveground pipe for the water inlet works, DAF, sludge areas, and chemical plant. A total of 48,000 inch-diameter joints were performed on pipe and fittings ranged 1” up to 48” diameter, over a period of approximately 08 months, which required more than 130 technicians specialized in FRP piping and steel fitters. The scope or works included the installation of over 148 ton of steel pipe supports and racks.