HERMES LLATAS Building Company: present in Lima's Metro Project Line 2

Building Consortion Metro 2 de Lima (CCM2L) is responsible for the construction of the Lima Metro megaproject, Line 2 and Line 4 branch. The objetive of project is build the first underground subway in Lima, which will be 35 kilometers long and 25 meters deep.

In November 2021, the building company HERMES LLATAS, commissioned by CCM2L, requested the fabrication of (02) 113 m3 tanks for water storage, in fiberglass FRP (Fiberglass Reinforced Polyester) of Ø 6.00 m x 4.40 m cylinder height and removable flanged cover (5.10 m total height), required for the construction of Station No. 3 in Callao.

Related Content

EN