LEPSA present in the construction of Lima´s Metro line 2

The Building Consortium Lima's Metro Line 2 (CCM2L) is formed by leading engineering and construction companies, such as Dragados and FCC from Spain, Salini Impregilo from Italy and COSAPI from Peru, responsible for the construction of the mega-project Lima's Metro Line 2 and branch of Line 4. The project has an investment of more than US$ 5.6 billion and aims to transform Lima through the construction of the first underground subway, which will have a total distance of 35 kilometers at a depth of 25 meters.

As of May 2019, CCM2L has requested the manufacture of batches of 6 tanks for each station: Callao, La Victoria and Santa Anita. The 40 m3 (Ø 3.50 x 5.00 m) FRP (Fiberglass Reinforced Plastic) tanks are used for the storage of water required for the construction process and on-site consumption.

EN