Our capabilities as a business allow us to participate in the Project ever since 2015, and strengthen our strategic relationships with international companies such as:
- SKIC
- CONSORCIO JJC-COSAPI
- CUMBRA
- COBRA
- TECNICAS REUNIDAS (España)
- CONSTRUCTORA SAN JOSE (España)
- JUVIER SAC
- WESTFIRE (JOHNSON CONTROLS)
- DEMEM SAC
- COSAPI S.A. Ingeniería y Construcción
Currently, LEPSA is working on the Auxiliary Units and Complementary Works area of the project.
LEPSA has successfully performed over 178,000 inch-diameter FRP joints, on piping ranging from 1” up to 96”, employing 650,000 man hours approximately. All our joints have been pressure tested up to 355 psi, with a successful rate over 99.5%.
As a company concerned with safety and the environment, we have registered ZERO fatal or incapacitating accidents during our 7 years of permanence, achieving one of the highest safety standards in the project; this highlights our experience and capacity to undertake piping assembly and joining services in the field, at a REGIONAL LEVEL.